Commercial

Application: Housing development of 6 dwellings, Co.Down

Installed: Autumn 2006

Consent: Tertiary treatment to discharge to take a lake at 5mg/litre BOD and 5mg/litre Suspended Solids

Solution: NIRBC supervised installation of its Purus modular system in two days using the client's contractors. The sub surface horizontal flow provides tertiary treatment of water following a package plant system.

Results: The system is currently operating to its design.